99 Wellington Crescent is a riverbank stabilization project that was completed along the south bank of the Assiniboine River.

Stabilization of the 99 Wellington Crescent area was achieved through a combination of willow cuttings, erosion control blanket, and plantings of native grasses and trees.

The 99 Wellington Crescent project area was approximately 2,400 m² and the revegetation was completed in two phases. The first phase included the installation of willow cuttings and erosion control blanket along the lower bank. The second phase consisted of native grass seeding and tree planting on the upper bank. Native Plant Solutions was involved in soil preparation, willow stake installation, native grass seeding, weed control, and erosion control.